picture

Advance Planning Studies

Franklin Partial Clover

The structure work for the Partial Clover alternative includes the addition of a new bridge over the I-15.

No changes will be made to the current Franklin Street bridge crossing over the I-15.

A link to the full Franklin Partial Clover APS file is at the bottom of the page. Listed below are portions of the APS that highlight the structural changes.

picture

Click image to enlarge and download.

Elevation Views

This is the elevation view of the Elsinore Hills Road Bridge. The bridge has a 7' - 0" depth with a vertical clearance of 18' - 5" due to the on/off ramps going under the bridge. The falsework for this project is 3' - 5".


picture

Click image to enlarge and download.

Cross Section

This is the Cross Section view of the Elsinore Hills Road Bridge. After a preliminary analysis, the columns will be 5' - 6" octagonal columns with flares similar to the Old Bridge on Franklin St.. The chain linked fence will be type 7 and the concrete barriers will be type 26 per Caltrans regulations for pedestrians. The superstructure will be a Cast-In-Place Pre-Stressed Concrete Box Girder.